Wolabla, Henry Parkes Way, Parkes NSW 2870
100MW+ Hybrid BESS & Solar Farm Initially projected to incorporate 80MW of solar and 100MW 2-4 hours BESS (Installed capacity between 200MWh - 400MWh) Nearest 132kv Substation in Manitdra is 22km Potential to leverage transmission and connection infrastructure of proposed windfarm on the same site for cost sharing. Opportunity to increase BESS capacity further to alleviate instability and congestion on this transmission corridor surrounded with multiple solar and wind projects.