Nericon, NSW
A hybrid project consist of 4.95MWac Solar + 22MWh BESS.
The project site is strategically positioned approximately 100 meters from the Zone Substation and occupies a leased area of 18.3 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.
The project site is strategically positioned approximately 100 meters from the Zone Substation and occupies a leased area of 18.3 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.

Kangaroo Valley, NSW
The proposed Battery Energy Storage System (BESS) has a capacity of approximately 300 MW and 600 MWh. Proposed lease area is 6 hectares with optimization still required. The connection to the substation is within a 2 km range of the 330 kV transmission line. At the Kangaroo Valley Substation, a spare bay investigation is necessary, along with due diligence for potential substation expansion.

Yoogali, NSW
This 100MW+ Hybrid BESS & Solar Farm is initially projected to incorporate 60MW of solar and 100MW 2-4 hours BESS (Installed capacity between 200MWh - 400MWh). Nearest 132kv Substation in Griffith is 1.8km. Potential to leverage transmission and connection infrastructure of proposed upgrade in Griffith. The proposed site comprised of amalgamation of 4 separate lots, with potential to expand further into surrounding lots.

Bevendale, NSW
The proposed large-scale Solar + BESS project is initially designed to include 180 MW of solar generation and 300 MW of battery energy storage, with the BESS sized at 900 MWh, subject to further optimisation. The existing substation has the potential to accommodate up to a 450 MW connection, pending detailed studies. The proposed connection may require up to 19 km of easement; however, alternative options such as constructing a new substation are being explored, particularly in view of the potential to expand the leased area.

Finley I, NSW
A hybrid project consist of 4.95MWac Solar + 11MWh BESS.
The project site is positioned 2.62km from the Zone Substation and occupies a leased area of 24 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site received Development Approval and Grid Connection Approval.
The project site is positioned 2.62km from the Zone Substation and occupies a leased area of 24 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site received Development Approval and Grid Connection Approval.

Finley Il, NSW
A hybrid project consist of 4.95MWac Solar + 11MWh BESS.
The project site is positioned 2.05km from the Zone Substation and occupies a leased area of 14 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently in final stages of development.
The project site is positioned 2.05km from the Zone Substation and occupies a leased area of 14 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently in final stages of development.

PIVOTEL SATELLITE 200KW Solar PV
Pivotel Satellite provides internet services to a wide range of clients including remote areas such as Northfolk islands and some pacific islands. Pivotel's main driver for the solar PV system was it's constant, stable daily energy usage and increasing energy tariffs.

Bilbul, NSW
A hybrid project consist of 4.95MWac Solar + 11MWh BESS.
The project site is strategically positioned less than 300m from the Zone Substation and occupies a leased area of 11 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site received Development Approval and Grid Connection Approval.
The project site is strategically positioned less than 300m from the Zone Substation and occupies a leased area of 11 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site received Development Approval and Grid Connection Approval.

Dalby, QLD
A hybrid project consist of 4.95MWac Solar + 22MWh BESS.
The project site is positioned approximately 2.47km from the Zone Substation and occupies a proposed leased area of 16 hectares. It is zoned as RTBC, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.
The project site is positioned approximately 2.47km from the Zone Substation and occupies a proposed leased area of 16 hectares. It is zoned as RTBC, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.

Tharbogang, NSW
A hybrid project consist of 4.95MWac Solar + 22MWh BESS.
The project site is positioned approximately 1.93km from the Zone Substation and occupies a proposed leased area of 32.95 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.
The project site is positioned approximately 1.93km from the Zone Substation and occupies a proposed leased area of 32.95 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.

Kooba, NSW
A hybrid project consist of 4.95MWac Solar + 22MWh BESS.
The project site is positioned approximately 5.1km from the Zone Substation and occupies a proposed leased area of 25.18 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.
The project site is positioned approximately 5.1km from the Zone Substation and occupies a proposed leased area of 25.18 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.

ORAN PARK MONTESSORRI ACADEMY - PV
Montessori is a leading childcare provider, opening yet another
quality facility located on a newly developed block of land.
quality facility located on a newly developed block of land.

Nericon, NSW
A hybrid project consist of 4.95MWac Solar + 22MWh BESS.
The project site is strategically positioned approximately 100 meters from the Zone Substation and occupies a leased area of 18.3 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.
The project site is strategically positioned approximately 100 meters from the Zone Substation and occupies a leased area of 18.3 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.

Finley I, NSW
A hybrid project consist of 4.95MWac Solar + 11MWh BESS.
The project site is positioned 2.62km from the Zone Substation and occupies a leased area of 24 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site received Development Approval and Grid Connection Approval.
The project site is positioned 2.62km from the Zone Substation and occupies a leased area of 24 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site received Development Approval and Grid Connection Approval.

Finley Il, NSW
A hybrid project consist of 4.95MWac Solar + 11MWh BESS.
The project site is positioned 2.05km from the Zone Substation and occupies a leased area of 14 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently in final stages of development.
The project site is positioned 2.05km from the Zone Substation and occupies a leased area of 14 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently in final stages of development.

Bilbul, NSW
A hybrid project consist of 4.95MWac Solar + 11MWh BESS.
The project site is strategically positioned less than 300m from the Zone Substation and occupies a leased area of 11 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site received Development Approval and Grid Connection Approval.
The project site is strategically positioned less than 300m from the Zone Substation and occupies a leased area of 11 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site received Development Approval and Grid Connection Approval.

Dalby, QLD
A hybrid project consist of 4.95MWac Solar + 22MWh BESS.
The project site is positioned approximately 2.47km from the Zone Substation and occupies a proposed leased area of 16 hectares. It is zoned as RTBC, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.
The project site is positioned approximately 2.47km from the Zone Substation and occupies a proposed leased area of 16 hectares. It is zoned as RTBC, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.

Tharbogang, NSW
A hybrid project consist of 4.95MWac Solar + 22MWh BESS.
The project site is positioned approximately 1.93km from the Zone Substation and occupies a proposed leased area of 32.95 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.
The project site is positioned approximately 1.93km from the Zone Substation and occupies a proposed leased area of 32.95 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.

Kooba, NSW
A hybrid project consist of 4.95MWac Solar + 22MWh BESS.
The project site is positioned approximately 5.1km from the Zone Substation and occupies a proposed leased area of 25.18 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.
The project site is positioned approximately 5.1km from the Zone Substation and occupies a proposed leased area of 25.18 hectares. It is zoned as RU1, not located within a designated fire or flood zone, requires minimal land
clearing.
This site is currently under active development.

Kangaroo Valley, NSW
The proposed Battery Energy Storage System (BESS) has a capacity of approximately 300 MW and 600 MWh. Proposed lease area is 6 hectares with optimization still required. The connection to the substation is within a 2 km range of the 330 kV transmission line. At the Kangaroo Valley Substation, a spare bay investigation is necessary, along with due diligence for potential substation expansion.

Yoogali, NSW
This 100MW+ Hybrid BESS & Solar Farm is initially projected to incorporate 60MW of solar and 100MW 2-4 hours BESS (Installed capacity between 200MWh - 400MWh). Nearest 132kv Substation in Griffith is 1.8km. Potential to leverage transmission and connection infrastructure of proposed upgrade in Griffith. The proposed site comprised of amalgamation of 4 separate lots, with potential to expand further into surrounding lots.

Bevendale, NSW
The proposed large-scale Solar + BESS project is initially designed to include 180 MW of solar generation and 300 MW of battery energy storage, with the BESS sized at 900 MWh, subject to further optimisation. The existing substation has the potential to accommodate up to a 450 MW connection, pending detailed studies. The proposed connection may require up to 19 km of easement; however, alternative options such as constructing a new substation are being explored, particularly in view of the potential to expand the leased area.

Wolabla, Henry Parkes Way, Parkes NSW 2870
100MW+ Hybrid BESS & Solar Farm Initially projected to incorporate 80MW of solar and 100MW 2-4 hours BESS (Installed capacity between 200MWh - 400MWh) Nearest 132kv Substation in Manitdra is 22km Potential to leverage transmission and connection infrastructure of proposed windfarm on the same site for cost sharing. Opportunity to increase BESS capacity further to alleviate instability and congestion on this transmission corridor surrounded with multiple solar and wind projects.

SOLAR FARM DEVELOPMENT INVESTMENT OPPORTUNITY
Atlas Renewables is a solar farm developer and aggregator. We develop, own and operate projects with a 4.99MW AC capacity and aggregate these projects forming a broader portfolio. Our first phase of sites are located exclusively in NSW, where high wholesale pricing and expected coal plant closures are expected to generate firm long-term returns on renewable generation assets

PIVOTEL SATELLITE 200KW Solar PV
Pivotel Satellite provides internet services to a wide range of clients including remote areas such as Northfolk islands and some pacific islands. Pivotel's main driver for the solar PV system was it's constant, stable daily energy usage and increasing energy tariffs.

ORAN PARK MONTESSORRI ACADEMY - PV
Montessori is a leading childcare provider, opening yet another
quality facility located on a newly developed block of land.
quality facility located on a newly developed block of land.
Send us a message
Whether you are interested in our services, want to partner with us, or simply have an inquiry, please get in touch with us below:
Phone
Sydney
Suite 1, 68-72 Railway Parade
Burwood NSW 2134
Burwood NSW 2134
Melbourne
Suite 6, 73A Rupert Street Collingwood VIC 3066
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.